Pan Wall×矢野コンクリート工業 - List of Manufacturers, Suppliers, Companies and Products

Pan Wall Product List

1~1 item / All 1 items

Displayed results

Cut Soil Reinforced Earth Wall Method - Pan Wall

Safe reverse winding construction method for ground reinforcement.

The PAN (Panel And Nail) WALL method is a construction technique based on the theories of steep slope stabilization and ground reinforcement. By achieving a steep slope (1:5 to 1:1), it preserves the natural slope as much as possible and is a highly safe method based on the reverse wrapping technique.

  • Retaining wall
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration